July 27, 2011

Plowing Pipe & Wire 072711

The plowing of pipe and wire resumed after a short delay and great progress is being made. For those of you who have not seen this part of the system installation take place, this video briefly demonstrates the operation. This took place on #12 tee which is now complete and operational.


Also, we have begun adding pond fill valves at each of the ponds on the course. This will allow the pond level to be controlled allowing for better management and protection of the fish populations. They also serve as drains should be have to empty the system of water to complete a repair.